ActionWell ActionWell
Assess my portfolio

Platform

The evidence behind your next production opportunity

Move from the portfolio to the well, understand the production pattern and assess the next action with your engineers.

01Portfolio coverage

See which wells deserve attention

Explore production histories and changes across the asset. Open the wells and groups that merit investigation, with the evidence behind each priority.

Public-record research · Asset names hidden Enlarge the image: Asset A from the air
Imagery: USDA NAIP 2024 via ND GIS Hub · © Mapbox · © OpenStreetMap · © Maxar

02Engineering investigation

The full history changes the question

Public-record research · Asset names hidden

In one North Dakota field, a 1.3% increase concealed a 22% decline across the other 35 producers. The next question is whether the concentrated increase will last.

Field oil, July 2025–June 2026 against the preceding twelve months.

Asset A: field oil 214,539 → 217,285 bbl, bridged by well A-1 (+47,373) and the other 35 producers (−44,627, −22%); decision supported: production planning. Enlarge the image

In another field, a well fell sharply in April and later recovered above its earlier producing-day rate. That later evidence belongs in any decision about remedial work.

Oil per producing day: July–December 2025 baseline, April 2026 and August 2026; three windows, not a monthly series.

Asset B: oil per producing day for four wells on one scale; B-4 16 → 1.5 → 55 bbl per producing day; decision supported: reassess the case for remedial work. Watch the two-minute investigationFrom a signal to a decision · 1:54

Connect the production pattern with operating events, tests and engineering context to assess the response.

03Engineering review

One correction can guide the next analysis

Record the assumption, the reason for changing it and the cases where the correction belongs. The next engineer can inspect that judgment and the work it affects.

Recorded product workflow · Demo engineer

Well C-1, reported oil per calendar day: the corrected window January 2018 to April 2019 with its own recalculated curve, beside the engineer’s reason, “Separate the later production interval.” Watch the 90-second workflowKeep the reason, improve the next review · 1:30

04Action assessment

Rank the work by the value it can deliver

With your operating records and economic inputs, assess feasible work, the expected response and the cost of execution. Compare it with waiting or collecting more information. Your engineers review the case. Your team decides what to fund.

Target workflow · Decision package
Proposed actionExpected responseFull costUncertaintyNext decision
Leave as isCurrent trajectory against the reviewed baselineNoneRange of the baseline forecastReview with the next production data
Gather more evidenceNarrows the explanations still openTest cost and deferred productionReduced once the result is inDecide after the result
Proposed workEngineer’s estimate, with range and durationWork, downtime and program costStated with the estimateApprove, defer or return for evidence

05Decision history

Keep the decision connected to what happens next

The intended workflow links the planned response, approved work, actual cost and subsequent production. That history can improve the next investigation and show whether a decision delivered value.

Target workflow · Illustrative baseline
Illustrative baseline forecast 0 200 400 history data vintage forecast BBL/D OIL
Measured oilBaseline forecastIllustrative range

The baseline is an operating reference, separate from reserves estimation.

Apply the workflow to your portfolio

Start with one asset and the production question your team wants to resolve.